Description of nano traffic color
Its properties include:
- Very smooth, even and impermeable surface
- Very good brightness and effect
- Good abrasion resistance
- Water and moisture resistant
- Excellent resistance to ultraviolet radiation of the sun
- Oils resistant to fuels
- Very fast drying speed
- has very good self-cleaning capability
- Excellent adhesion to asphalt and concrete
- Excellent adhesion and durability
- Can be used and executed with marking machines
- Usability in different climatic zones
- Can be used with glass bits
Uses
This color is widely used for marking and marking roads and passages, including its uses are:
- Roads and highways
- Airport runway markings
- Urban thoroughfares
- Urban bookmarks
- Marking halls and parking lots
- Painting floors and walls of halls and parking lots
Technical specifications
فام td> | Traffic white – Traffic yellow – Other shades |
Volume solid percentage | 58 ± 2 |
Storage time | one year |
Recommended thickness | 100 to 400 microns |
Density | 05, 0 ± 1.25 |
350 micron theory coverage | 1.2 square meters per kilogram |
Drying and coating conditions
Drying time | Next layer application time |
Temperature | surface | depth | Complete hardening | minimum | Maximum | Notes | |
25 ° C | 1 hour | 10 hours | 2 days | 6 hours | 7 days | Other factors such as the thickness of the color film and temperature changes, etc. affect the drying time. |
Terms and equipment of application
Thinner | Traffic thinner |
Application temperature | 5 to 50 degrees Celsius |
Maximum relative humidity | 80% |
Surface temperature | 3 to 5 degrees above the dew point |
Application method | Air spray. Airless spray, brush and roll |
Application conditions | Ordinary spray | Airless spray | brush | Roll |
Percent solvent | 5-10% | 3-5% | 3-7% | 4-8% |
head pressure | 2 -5 times | 140 – 160 bar | | |
Nozzle head diameter | 1.2 to 1.8 mm | 0.3 to 0.5 mm | | |
hand distance | 30-50 cm | 40-60 cm | | |
Surface preparation
Painted surfaces – These surfaces must be completely clean and free of any grease and other contaminants. Before painting the surface must be perfect
Dry and if a long time has passed since the application of the undercoat, a suitable roughness should be created by soft sanding on the surface. Steel surfaces – Wash the steel surface thoroughly to remove grease, salt and any other contaminants. De-ring and create Profiles on surfaces by various methods such as ballast document up to 2.5 degrees Swedish SA or by mechanical tools up to ST3-ISO degree
(SP10-SSPC). In metal structures and welded points and corners should be smooth and polished and free of any appendages and sharpness. After de-rusting and creating the profile of the particles obtained from the preparation and other contaminants, remove the surface with moisture and grease free from moisture and grease by vacuum method. Note that the application of the first layer (primer) should be done no later than two hours after preparation.
Staining instructions
After preparing the surface and choosing the method of painting, first mix the fabric of the relevant solution with the recommended ratio and mix the mixture thoroughly to make it uniform. Add a special amount of ethyl silicate thinner if needed (usually not needed) (add to the mixture and stir until a primer is applied, then apply the paint with a suitable tool.
Storage and transportation
The above color was flammable
Description of matte alkyd surface paint
Its properties include:
- Good abrasion resistance
- Possibility of operation up to zero temperature
- Water and moisture resistant
- Resistance to oils and petroleum products
- Easy and fast implementation
- Excellent adhesion to concrete and masonry and metal surfaces
- Create an integrated and flooded surface
- Proper corrosion resistance
Uses
This paint is used as a top and middle layer for systems with moderate and good capabilities in terms of corrosion, and due to the price and easy to use conditions, it achieves special capabilities, including its uses include:
- Decorative building colors
- Marine Industries
- Pipelines and steel and concrete structures
- Refineries, power plants and chemical plants
- Concrete surfaces
- To mark
Technical specifications
فام td> | in different shades |
Volume solid percentage | 50 ± 2 |
Storage time | one year |
Recommended thickness | 50 to 100 microns |
Density | 05, 0 ± 1.45 |
Theoretical coverage of 50 microns per kilogram | 7.8 m2 |
Theoretical coverage of 50 microns per liter | 11 m2 / td> |
Number of components | single component |
Drying and coating conditions
Drying time | Next layer application time |
Temperature | surface | depth | Complete hardening | minimum | Maximum | Notes | |
25 ° C | 4 hours | 2 days | 6 days | 24 hours | 7 days | Other factors such as the thickness of the color film and temperature changes, etc. affect the drying time. |
Terms and equipment of application
Thinner | Alkyd Thinner |
Application temperature | 5 to 50 degrees Celsius |
Maximum relative humidity | 80% |
Surface temperature | 3 to 5 degrees above the dew point |
Application method | Air spray. Airless spray, brush and roll |
Application conditions | Ordinary spray | Airless spray | brush | Roll |
Percent solvent | 7-10% | 3-5% | 5-7% | 4-6% |
head pressure | 2 -5 times | 140 – 160 bar | | |
Nozzle head diameter | 1.2 to 1.8 mm | 0.3 to 0.5 mm | | |
hand distance | 30-50 cm | 40-60 cm | | |
Surface preparation
Painted surfaces – These surfaces must be completely clean and free of any grease and other contaminants. Before painting, the surface should be completely dry and if a long time has passed since the application of the undercoat, a suitable roughness should be created by soft sanding on the surface. Steel surfaces – Wash the steel surface with a suitable solvent to remove grease, salt and any other contaminants. De-rust and create profiles on surfaces by various methods such as sand blasting up to 2.5 degrees Swedish or by mechanical tools up to ISO-ST3 degree. In metal structures and welded points and corners should be smooth and polished and free of any appendages and sharpness. After de-rusting and creating a profile, remove the particles from the preparation and other contaminants from the surface with a pressure of air free of moisture and grease and with the method of vacuum and thoroughly clean. Note that the application of the first layer (primer) should be done no later than two hours after preparation. Concrete surfaces – If the concrete is fresh, it must be 28 days after the concrete has been applied (the concrete surface is completely dry). If the concrete is old, the surface must be washed with fresh water to remove contaminants such as salts, grease, dust and Dust, loose and unstable particles, etc. should be removed from its surface. It is recommended to use alkaline degreasers to remove all contaminants if necessary, especially in the case of old concretes, and to repeat the washing operation with water after degreasing. In order to create a suitable roughness, both chemical and mechanical methods can be used.