ایکالر

Alkyd intermediate paint (IPS-M-TP-155)

Equal Alkyd Aluminum Medium Paint Contains Aluminum Pigment. The mentioned coating is in accordance with the standard, IPS-M-TP-155. Its drying is the result of solvent jumping and oxidation.

[print_button_en]
رنگ روغنی

Description of solvent-free sanitary epoxy primer

Its properties include:

  1. Very good corrosion resistance
  2. High chemical resistance
  3. High abrasion resistance and hardness
  4. Excellent water and moisture resistance
  5. Good adhesion to steel surfaces
  6. Applicable with thicknesses over 200 microns
  7. Surface impermeability
  8. Designed for health systems
  9. Shine and excellent appearance

Uses

This coating is used alone as the final layer of sanitary epoxy systems and drinking water to protect the surfaces against corrosion and microbes. Due to the high solid percentage of paint with a spraying step, thicknesses up to 500 microns can be achieved. Its uses include:

  • Drinking water tanks
  • Water transfer pipes
  • Sanitary equipment
  • Industrial Drug Making Machines
  • Food Equipment
  • Food storage cells
  • Sanitary ware containers
  • Clean hall and operating room flooring

Technical specifications

فام

White (other shades suggested subject to conditions)
Volume solid percentage 100
Storage time one year
Recommended thickness 500 to 200 microns
Density 05, 0 ± 1.53
50 micron theory cover 1.5 square meters per kilogram
Theoretical coverage of 100 microns per liter 6 m2 / td>

Drying and coating conditions

Drying time Next layer application time
Temperature surface practical Complete hardening minimum Maximum Notes
25 ° C 4 hours 24 hours 7 days 12 to 24 hours 6 days Other factors such as the thickness of the color film and temperature changes, etc. affect the drying time.

Terms and equipment of application

Thinner TEP (Epoxy Thinner)
Application temperature 5 to 50 degrees Celsius
Maximum relative humidity 80%
Surface temperature 3 to 5 degrees above the dew point
Application method Air spray. Airless spray, brush and roll
useful life of paint and hardener mixture 1 hour at 20 ° C
Application conditions Ordinary spray Airless spray brush Roll
Percent solvent 15-10% 8-5% 9-6% 9-6%
head pressure 4-6 times 120-160 times
Nozzle head diameter 1.6 to 1.8 mm 0.35 to 0.5 mm
hand distance 30-50% 40-60 cm

Surface preparation

Painted surfaces – These surfaces must be completely clean and free of any grease and other contaminants. Before painting, the surface should be completely dry and if a long time has passed since the application of the undercoat, a suitable roughness should be created by soft sanding on the surface.
Steel surfaces – Wash the steel surface with a suitable solvent to remove grease, salt and any other contaminants.
De-rust and create profiles on surfaces by various methods such as sand blasting up to 2.5 degrees Swedish or by mechanical tools up to ISO-ST3 degree.
In metal structures and welded points and corners should be smooth and polished and free of any appendages and sharpness. After de-rusting and creating a profile, remove the particles from the preparation and other contaminants from the surface with a pressure of air free of moisture and grease and with the method of vacuum and thoroughly clean.
Note that the application of the first layer (primer) should be done no later than two hours after preparation.
Concrete surfaces – If the concrete is fresh, it must be 28 days after the concrete has been applied (the concrete surface is completely dry). If the concrete is old, the surface must be washed with fresh water to remove contaminants such as salts, grease, dust and Dust, loose and unstable particles, etc. from its surface

Description of alkyd intermediate paint (IPS-M-TP-155)

Among the properties are:

  1. Good flexibility
  2. Sun-resistant
  3. Resistant to corrosive agents
  4. Create a smooth and even surface
  5. Excellent adhesion to metal surfaces
  6. Good corrosion resistance

Uses

This paint is used as an intermediate layer in alkyd three-layer systems. For example, in the color system on the alkyd primer, iron oxide is very suitable. Among its uses are:

  • Industrial devices and equipment
  • Pipelines outside and exposed to air
  • Ship deck equipment and industries and ship deck superstructures
  • Structures and metal skeletons

Technical specifications

فام

Silver
Volume solid percentage 57 ± 2
Storage time one year
Recommended thickness 40 to 70 microns
Density 05, 0 ± 1.18
Theoretical coverage of 70 microns per kilogram 7 square meters
Theoretical coverage of 70 microns per liter 8.3 m2
Number of components single component

Drying and coating conditions

Drying time Next layer application time
Temperature surface depth Complete hardening minimum Maximum Notes
25 ° C 4 hours 24 hours 7 days 24 hours 5 days Other factors such as the thickness of the color film and temperature changes, etc. affect the drying time.

Terms and equipment of application

Thinner Alkyd Thinner
Storage time one year
Application temperature 5 to 50 degrees Celsius
Maximum relative humidity 80%
Surface temperature 3 to 5 degrees above the dew point
Application method Air spray. Airless spray, brush and roll
Application conditions Ordinary spray Airless spray brush Roll
Percent solvent 10 to 15% 4 to 7% 4-7% 4-6%
head pressure 4 to 6 times 120 – 160 bar
Nozzle head diameter 1.6 to 2 mm 0.25 to 0.55 mm
hand distance 30-50 cm 40-60 cm

Surface preparation

Painted surfaces – These surfaces must be completely clean and free of any grease and other contaminants. Before painting, the surface should be completely dry and if a long time has passed since the application of the undercoat, a suitable roughness should be created by soft sanding on the surface.
Steel surfaces – Wash the steel surface with a suitable solvent to remove grease, salt and any other contaminants. De-rust and create profiles on surfaces by various methods such as sand blasting up to 2.5 degrees Swedish or by mechanical tools up to ISO-ST3 degree. In metal structures and welded points and corners should be smooth and polished and free of any appendages and sharpness. After de-rusting and creating a profile, remove the particles from the preparation and other contaminants from the surface with a pressure of air free of moisture and grease and with the method of vacuum and thoroughly clean. Note that the application of the first layer (primer) should be done no later than two hours after preparation.
Concrete surfaces – If the concrete is fresh, 28 days must have passed since the concrete was applied (the concrete surface is completely dry). If the concrete is old, the surface must be washed with fresh water to remove contaminants such as salts, grease, dust and Dust, loose and unstable particles, etc. should be removed from its surface. If necessary, especially in the case of old concretes, it is recommended to use alkaline degreasers to remove all contaminants and to repeat the washing operation with water after degreasing. In order to create a suitable roughness, both chemical and mechanical methods can be used. Mechanical method by mechanical power tool

محصولات مشابه

عنوان

لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.

عنوان

لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.

عنوان

لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.

عنوان

لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.