Polyamide build intermediate epoxy primer (IPS-M-TP-220
The middle color of Bild Ecoller epoxies is a two-component epoxy-poly-hope middle paint. How hard it is is the result of solvent evaporation and the reaction between the components
Description of solvent-free sanitary epoxy primer
Its properties include:- Very good corrosion resistance
- High chemical resistance
- High abrasion resistance and hardness
- Excellent water and moisture resistance
- Good adhesion to steel surfaces
- Applicable with thicknesses over 200 microns
- Surface impermeability
- Designed for health systems
- Shine and excellent appearance
Uses
This coating is used alone as the final layer of sanitary epoxy systems and drinking water to protect the surfaces against corrosion and microbes. Due to the high solid percentage of paint with a spraying step, thicknesses up to 500 microns can be achieved. Its uses include:- Drinking water tanks
- Water transfer pipes
- Sanitary equipment
- Industrial Drug Making Machines
- Food Equipment
- Food storage cells
- Sanitary ware containers
- Clean hall and operating room flooring
Technical specifications
فام td> | White (other shades suggested subject to conditions) |
Volume solid percentage | 100 |
Storage time | one year |
Recommended thickness | 500 to 200 microns |
Density | 05, 0 ± 1.53 |
50 micron theory cover | 1.5 square meters per kilogram |
Theoretical coverage of 100 microns per liter | 6 m2 / td> |
Drying and coating conditions
Drying time | Next layer application time | ||||||
Temperature | surface | practical | Complete hardening | minimum | Maximum | Notes | |
25 ° C | 4 hours | 24 hours | 7 days | 12 to 24 hours | 6 days | Other factors such as the thickness of the color film and temperature changes, etc. affect the drying time. |
Terms and equipment of application
Thinner | TEP (Epoxy Thinner) |
Application temperature | 5 to 50 degrees Celsius |
Maximum relative humidity | 80% |
Surface temperature | 3 to 5 degrees above the dew point |
Application method | Air spray. Airless spray, brush and roll |
useful life of paint and hardener mixture | 1 hour at 20 ° C |
Application conditions | Ordinary spray | Airless spray | brush | Roll |
Percent solvent | 15-10% | 8-5% | 9-6% | 9-6% |
head pressure | 4-6 times | 120-160 times | ||
Nozzle head diameter | 1.6 to 1.8 mm | 0.35 to 0.5 mm | ||
hand distance | 30-50% | 40-60 cm |
Surface preparation
Painted surfaces – These surfaces must be completely clean and free of any grease and other contaminants. Before painting, the surface should be completely dry and if a long time has passed since the application of the undercoat, a suitable roughness should be created by soft sanding on the surface. Steel surfaces – Wash the steel surface with a suitable solvent to remove grease, salt and any other contaminants. De-rust and create profiles on surfaces by various methods such as sand blasting up to 2.5 degrees Swedish or by mechanical tools up to ISO-ST3 degree. In metal structures and welded points and corners should be smooth and polished and free of any appendages and sharpness. After de-rusting and creating a profile, remove the particles from the preparation and other contaminants from the surface with a pressure of air free of moisture and grease and with the method of vacuum and thoroughly clean. Note that the application of the first layer (primer) should be done no later than two hours after preparation. Concrete surfaces – If the concrete is fresh, it must be 28 days after the concrete has been applied (the concrete surface is completely dry). If the concrete is old, the surface must be washed with fresh water to remove contaminants such as salts, grease, dust and Dust, loose and unstable particles, etc. from its surfaceDescription of IPS-M-TP-220 middle polyamide building epoxy primer
Its properties include:- Flexibility
- High chemical resistance
- High abrasion resistance and hardness
- Excellent water and moisture resistance
- Excellent adhesion to primer and surface paint
- Applicable to thicknesses over 100 microns
Uses
This coating is used alone or as an intermediate layer to protect surfaces in industrial, chemical and marine environments. Due to the high solid percentage of paint, a high thickness can be obtained with one spraying step. Among its uses are:- Drilling rigs and installations
- Water contact facilities and equipment
- Exterior parts of storage tanks
- Refineries, power plants and chemical plants
- Structural steel structures, pipes, bridges and offshore installations
Technical specifications
فام td> | کرم – طوسی – الوان td> |
Volume solid percentage | 61 ± 2 |
Storage time | one year |
Recommended thickness | 100 microns |
Density | 05, 0 ± 1.55 |
Theoretical coverage of 70 microns per kilogram | 4 square meters |
Theoretical coverage: 70 microns per liter | 4 square meters |
percentage by weight | 80 ± 1 |
Number of components | Two components |
weight ratio of components | 90% of the first component and 10% of the second component (hardener) |
Volume mixing ratio of components | 83% of the first component and 17% of the second component (hardener) |
Drying and coating conditions
Drying time | Next layer application time | ||||||
Temperature | surface | depth | Complete hardening | minimum | Maximum | Notes | |
25 ° C | 2 to 3 hours | 24 hours | 7 days | 12 to 14 hours | 6 days | Other factors such as the thickness of the color film and temperature changes, etc. affect the drying time. |
Terms and equipment of application
Thinner | TED (Epoxy Thinner) |
Application temperature | 5 to 50 degrees Celsius |
Maximum relative humidity | 80% |
Surface temperature | 3 to 5 degrees above the dew point |
Application method | Air spray. Airless spray, brush and roll |
useful life of paint and hardener mixture | 8 hours at 20 ° C |
Application conditions | Ordinary spray | Airless spray | brush | Roll |
Percent solvent | 15-10% | 8-5% | 9-6% | 9-6% |
head pressure | 4-6 times | 120-160 times | ||
Nozzle head diameter | 1.6 to 1.8 mm | 0.35 to 0.5 mm | ||
hand distance | 30-50 cm | 40-60 cm |
Surface preparation
Painted surfaces – These surfaces must be completely clean and free of any grease and other contaminants. Before painting, the surface should be completely dry and if a long time has passed since the application of the undercoat, a suitable roughness should be created by soft sanding on the surface. Steel surfaces – Wash the steel surface with a suitable solvent to remove grease, salt and any other contaminants. De-rust and create profiles on surfaces by various methods such as sand blasting up to 2.5 degrees Swedish or by mechanical tools up to ISO-ST3 degree. In metal structures and welded points and corners should be smooth and polished and free of any appendages and sharpness. After de-rusting and creating a profile, remove the particles from the preparation and other contaminants from the surface with a pressure of air free of moisture and grease and with the method of vacuum and thoroughly clean. Note that the application of the first layer (primer) should be done no later than two hours after preparation. Concrete surfaces – If the concrete is fresh, 28 days must have elapsed since the concrete was applied (concrete surfaceمحصولات مشابه
عنوان
لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.
عنوان
لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.
عنوان
لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.
عنوان
لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطر آنچنان که لازم است.